*hay nku, i wont consider a lot regarding it but, mahirap na ma-excite as my layouting capabilities is limited to sims hehe.
oct 22, just one more month got passed.
we had been likely to start to see the product at 9am so hun’s tatay had been knocking on all of our apt’s door by 815. they grabbed 15 mins before we woke up and were able to nudge hun to start the door. half-hour later we were at soho belair lobby, waiting around for agnes, a meridien workforce, to exhibit united states the system. halimaw, she made a decision to appear after a good 50 mins afterwards. haggard na rush yun ha kaines!!
the unit was basically all right, needing sole lesser repairs that should be finished and will be inspected on all of our second check out this week. anyways, I believe we’ll be doing some building work as well as the extra hun and I also chat abt they, the greater number of we determine carrying out most of the big restorations before we move in. we are considering light and hot water heater installment, paint job, installation of blinds, and some extra — including an overall total revamp on the present surfaces, which are too tiny so either expansion na lang or total revamp talaga. Read more